Well, I started the 10-step program. I am on Step 8.....8 more pieces of equipment. By that time the shop space will be the limiting factor.
Actually, I did stray fom the program: Had to buy some steel and -lo and behold- there was a big Jet metal cutting band saw in the showroom at Dillon. After lusting and drooling over it, my friend (who works at Dillon) casually informed me that the did get a shipment of 10 of those and 2 of them came in damaged and needed to be disposed off. Out of the goodness of my heart, I offered my services to clear out those piles of scrap. To make a long story short, I took both for some -minor-nominal sum of money. All that was damaged was a scratch, one of the stop switch levers and one brass brush wheel cleaner was bend. After exhaustive repair (about 5 min) the saws were in perfect shape.
Not a 36" bandsaw, just a little one.
Bernhard