In the winter of 2007 I started building my new 22 x 28 workshop. The shop is finished and I will attempt to post pictures of it here.
The concrete floor has cured for 2 weeks now and I figure that is good enough. Beside that, I wanted to get the building started.
The first wall is up, now for the rest.
All 4 walls standing
Using a lift I rented to install the roof trusses
Looking at the roof trusses from inside the workshop.
Time to get the building undercover incase nasty weather comes along.
Installing the vinyl siding so this building will match my house which is actually behind me.
Electrical, insulation and wallboard finished. Installing the propane heater so I can work in comfort when the weather is not so nice.
8x8 room to house the dustcollector.
Last step, epoxy finish on the floor. Now I can get the tools moved in and get started on the cabinets.
The concrete floor has cured for 2 weeks now and I figure that is good enough. Beside that, I wanted to get the building started.
The first wall is up, now for the rest.
All 4 walls standing
Using a lift I rented to install the roof trusses
Looking at the roof trusses from inside the workshop.
Time to get the building undercover incase nasty weather comes along.
Installing the vinyl siding so this building will match my house which is actually behind me.
Electrical, insulation and wallboard finished. Installing the propane heater so I can work in comfort when the weather is not so nice.
8x8 room to house the dustcollector.
Last step, epoxy finish on the floor. Now I can get the tools moved in and get started on the cabinets.