I already moved 2 trailer loads of lumber into the attic.... Im TIRED!!!Looks good, Chris. Now the fun begins.
Add some more wiring.... 220v outlets (8) of them, and 110v outlets... install LED lighting fixtures, add insulation, putting OSB on the walls, dust collection ducting, build a few benches and shelves, install the equipment...Nice! How much finish work do you have to do on the inside? I did mine about year ago, but it is only 24x24. [And no upstairs]
...and I"m still not 100% complete. Someday, I guess.
Yep, that about what I had to do. Still don't have the DC duct ran. Mostly complete on everything else.Add some more wiring.... 220v outlets (8) of them, and 110v outlets... install LED lighting fixtures, add insulation, putting OSB on the walls, dust collection ducting, build a few benches and shelves, install the equipment...
I already do live there mike, you can see the yellow house in the background in the first picture, its on the water.Looks great, so this is basically a very nice shop with living space? You plan to live here?