Hey guys - I'm going to be posting BF totals from your replies- Please check the first post of this thread and let me know if all is cool. I accounted for 3650BF from your replies. So I have to close this for now - Jim also has a 500 BF order in - which I forgot to post :slap: I think with the WO I have and his we should have enough to fill Scott's 4000 BF kiln to over flowing...
Scott told me if I cut the 8/4 early, he can put it on top of the load when the load comes down to what the 8/4 is at as long as it's below 20% MC. So that's what I'll do. Cut the big 40" dia WO into 8/4, stick it on the trailer and take the trailer home, till I start working out at Jim's. I have a couple smaller maples and a sycamore out there that I've been letting spalt so I'm going to cut those to while I'm at it. Then I'll move my mill out from the log yard - which should be fun since it ain't been moved in a while. Bring it home a change the oil and give her a good greasing and looking over. I'll load up the bobcat on the bobcat trailer and take that out to Jim's and start hauling running logs up out of the woods...
Jeff you are more than welcome to come out and [strike]play[/strike] work with us - I'll put you on the wood mizer for a while (you can cut your own lumber) - I think you'll enjoy it...
Thanks