OK, I'm back seeking your assistance and input again on the same topic!
My DC "trunk" line run will probably be in the neighborhood of 30' from the DC to the fartherest point, not counting the drop length. My ceiling is 10'. (Yeah, I'm running overhead>)
Sooo----, what cfm would you consider as a minimum for this length of run? I'm gonna run 4" pipe, using metal blast gates. I presently have a Delta 1 hp that I don't think is going to cut it for multiple tool use.
I'm looking at Jet, PM, HF, etc. I only want to do this once, BUT, my budget won't stand the big Cyclone units at this time.
The system will be serving: Belt sander, band saw, router table, table saw (when Alan gets his "groove going!), jointer, and that dang SCMS that I love so well!
My DC "trunk" line run will probably be in the neighborhood of 30' from the DC to the fartherest point, not counting the drop length. My ceiling is 10'. (Yeah, I'm running overhead>)
Sooo----, what cfm would you consider as a minimum for this length of run? I'm gonna run 4" pipe, using metal blast gates. I presently have a Delta 1 hp that I don't think is going to cut it for multiple tool use.
I'm looking at Jet, PM, HF, etc. I only want to do this once, BUT, my budget won't stand the big Cyclone units at this time.
The system will be serving: Belt sander, band saw, router table, table saw (when Alan gets his "groove going!), jointer, and that dang SCMS that I love so well!