I hope it's ok to post this here... if not, I apologize and I'd appreciate the mod's moving it to the right forum... or the trash bin if it's more appropriate.
I know it's been a long while since I've even posted... but I've been just a tad busy with a few thingy's...
This is where I started about Labor Day of 2007...
Bottom line; I Need help with my studio finalization.
If yer' a sawdust makin' muso anywhere near Graham... I got a deal for ya'.
I'm willing to trade labor:studio time, 2:1... and depending on experience, I'll negotiate from there.
I'm very serious about the offer, and this ain't no bargain basement operation...
Here's a list of our gear;
http://www.dmmobile.com/?page_id=4
Here's what I need help with...
Turning this:
and this:
along with 1200 sq ft of 3/4" T&G jatoba flooring....
Into this:
ok, it won't be as nice, or nearly as big, as Avatar... but, my studio was designed by the same guy who finished the acoustic treatment there.
The floors are gonna be stained and sealed concrete, so there's no flooring to worry about.
The ceiling and walls are already completely designed to excruciating detail, so there's no real hemming and hawing... just some heavy duty woodworkin' and should be a pretty interesting time.
The wood we'll be working with is QS and FS red oak (from last year's Raleigh Lumber Run), some other red oak, and ERC from trees on my property, walnut trim and the T&G jatoba that I need to glue up into boards.
I have no idea how much time we're talkin' about, but I suspect that we're talking at least an album's worth of music... maybe more.
Here's the first pass on a few of the quarter sawn and flat sawn red oak... VERY pretty!!!
(OK, so it's not that good of a pic....)
But, if yer' a glutton fer' punishment... I'd love to hear from ya!
PM, email or phone is fine...
Thanx!
Max
I know it's been a long while since I've even posted... but I've been just a tad busy with a few thingy's...
This is where I started about Labor Day of 2007...
Bottom line; I Need help with my studio finalization.
If yer' a sawdust makin' muso anywhere near Graham... I got a deal for ya'.
I'm willing to trade labor:studio time, 2:1... and depending on experience, I'll negotiate from there.
I'm very serious about the offer, and this ain't no bargain basement operation...
Here's a list of our gear;
http://www.dmmobile.com/?page_id=4
Here's what I need help with...
Turning this:
and this:
along with 1200 sq ft of 3/4" T&G jatoba flooring....
Into this:
ok, it won't be as nice, or nearly as big, as Avatar... but, my studio was designed by the same guy who finished the acoustic treatment there.
The floors are gonna be stained and sealed concrete, so there's no flooring to worry about.
The ceiling and walls are already completely designed to excruciating detail, so there's no real hemming and hawing... just some heavy duty woodworkin' and should be a pretty interesting time.
The wood we'll be working with is QS and FS red oak (from last year's Raleigh Lumber Run), some other red oak, and ERC from trees on my property, walnut trim and the T&G jatoba that I need to glue up into boards.
I have no idea how much time we're talkin' about, but I suspect that we're talking at least an album's worth of music... maybe more.
Here's the first pass on a few of the quarter sawn and flat sawn red oak... VERY pretty!!!
(OK, so it's not that good of a pic....)
But, if yer' a glutton fer' punishment... I'd love to hear from ya!
PM, email or phone is fine...
Thanx!
Max