I have been asked to find a craftsman to build a shoe shine station to be placed in a downtown Raleigh building. I am hoping one of our members can take this on and make some cash.
The photo below is what we want to duplicate but in cherry instead. The unit is basically three tiers and the two seats on top. The bottom tier is 60" wide by 48" deep and 12" high. The second tier is 36"deep and the third is 24" deep. The drawer are on full extension slides. I would provide the seat cushions, the foot rest and the carpet. I would expect the builder to deliver and set in place in the downtown building. I can give you as many photos as necessary but our unit only has to look similar not exact.
If chosen you would be paid by my company not a third party and I sure we can arrange upfront material funds. We would be keeping this transaction entirely above board and therefore you would have to provide a tax id or accept a 1099 at year end -- we can work out the details.
If you are interested in doing this please provide a total cost estimate to me before 5 pm Sept 10 as I must respond quickly to the property manager. Production time can be slower, but once given the green light I would want the unit within 6 weeks. If you have any questions please email me as that works so much better than private messages thanks phil
The photo below is what we want to duplicate but in cherry instead. The unit is basically three tiers and the two seats on top. The bottom tier is 60" wide by 48" deep and 12" high. The second tier is 36"deep and the third is 24" deep. The drawer are on full extension slides. I would provide the seat cushions, the foot rest and the carpet. I would expect the builder to deliver and set in place in the downtown building. I can give you as many photos as necessary but our unit only has to look similar not exact.
If chosen you would be paid by my company not a third party and I sure we can arrange upfront material funds. We would be keeping this transaction entirely above board and therefore you would have to provide a tax id or accept a 1099 at year end -- we can work out the details.
If you are interested in doing this please provide a total cost estimate to me before 5 pm Sept 10 as I must respond quickly to the property manager. Production time can be slower, but once given the green light I would want the unit within 6 weeks. If you have any questions please email me as that works so much better than private messages thanks phil