» Online Users: 74 | | 30 members and 44 guests | | 299T , 6_Myles , Alex Franke , Brad Parsley , DaveO , dpanda , dpsnyder , Dudelive , Gotcha6 , jeff... , Jim Murphy , Joe Lyddon , junquecol , mgoins , mjmlbp , MrAudio815 , PChristy , ptt49er , Rescue U , rsitzejr , ScottM , Shayne , Splint Eastwood , Sully , TedAS , tmerrill , toolferone , Travis Porter , woodArtz , woodylarry | | Most users ever online was 180, 04-22-2008 at 12:18 AM. |  | |
10-21-2006, 09:24 PM
|
#1 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | Today Travis Porter, his friend Tommy and Woodworker2000 came by to help me build a partition in my garage for my shop. Travis also was kind enough to bring his portable compressor and framing nailer.
We built the wall in two sections. The overall dimensions are 10' tall by 22.5' long. We did the framing, the door cut out and the opening for an AC unit. We also attached plywood to the shop side of the wall. When I finish that I will have all the electrical done, then insulate the all and then have the outside of the wall sheetrocked and mudded.
I intend to panel the entire inside of the shop and insulate the garage door.
Here are some pictures of todays work.
Thanks Travis, Tommy and Woodworker2000  |
| |
10-21-2006, 09:26 PM
|
#2 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | Here are three more shots.
Doug |
| |
10-21-2006, 09:37 PM
|
#3 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | Inside the shop...
Doug |
| |
10-21-2006, 09:39 PM
|
#4 | | Vice-President Libraries Administrator
Name: Rob City: Hendersonville State: NC County: Henderson Join Date: Nov 2005 Age: 66 Avg Visit Freq/Week = 6.81 over 180 days | So long garage, hello SHOP! Great job, guys -- Another good deed done by NCWoodworkers helping one another!
Rob
__________________
Rob  Truths: There is no such thing as a 25 hour day, so why do I keep trying to cram so much into every day so it seems that way! |
| |
10-21-2006, 09:55 PM
|
#5 |
Name: Mark City: Concord State: NC County: Cabarrus Join Date: Nov 2005 Age: 53 Avg Visit Freq/Week = 6.96 over 180 days | Great job guys! Looks great!
Especially like seeing those Systainers in there. I've got a few in my shop too.
Mark |
| |
10-21-2006, 11:17 PM
|
#6 |
Name: Travis City: Wake Forest State: NC County: Wake Join Date: Dec 2005 Avg Visit Freq/Week = 5.79 over 180 days | Hey cool, you cut the door way out. |
| |
10-21-2006, 11:21 PM
|
#7 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | Travis:
I decided to use the sawzall to cut away most of the doorway. I will use the router tomorrow, time and LOML allowing. This way I don't have the bulk of the material in the way and can better guide the router. I also added more cross pieces. I will add the last king stud tomorrow as well.
Thanks again for everything. Hopefully I can pay it forward.
Doug |
| |
10-22-2006, 10:58 AM
|
#8 |
Name: Travis City: Hickory State: NC County: Catawba Join Date: Jun 2006 Avg Visit Freq/Week = 0.70 over 180 days | Doug,
You do not have to bother with the router. If you are going to put a door up the casing will morer than cover the sawed edge. Unless of course you like making saw dust which is always fun. 
__________________
Travis
" the good thing with me and woodworking .... I have nothing to unlearn" |
| |
10-22-2006, 11:26 AM
|
#9 | | Moderator
Name: Nick City: Clemmons State: NC County: Davidson Join Date: Jun 2006 Age: 50 Avg Visit Freq/Week = 6.84 over 180 days |
__________________ Nick Z To do important deeds, two things are necessary; a plan and not quite enough time. |
| |
10-22-2006, 11:47 AM
|
#10 |
Name: jeff... City: Stovall State: NC County: Granville Join Date: Mar 2006 Avg Visit Freq/Week = 6.81 over 180 days | What's even cooler is the awesome folks we have on this site, always willing to lean a helping hand. I second Nick
__________________ "Do, or do not. There is no 'try'." -- Jedi Master Yoda |
| |
10-22-2006, 01:54 PM
|
#11 | | Moderator
Name: Ray City: Raleigh State: NC County: Wake Join Date: Mar 2006 Avg Visit Freq/Week = 0.70 over 180 days | Doug,
Looks like you did a terrific job on that partition. Congrats.
Ray
__________________
I cut that board twice and it's STILL too short.
|
| |
10-22-2006, 06:48 PM
|
#12 |
Name: Charles City: Wilmington State: NC County: New Hanover Join Date: Nov 2005 Age: 61 Avg Visit Freq/Week = 6.77 over 180 days | Great job and teamwork!! |
| |
10-22-2006, 08:50 PM
|
#13 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | I put up the rest of the plywood paneling today and added the missing king stud. It all went quickly thanks to Travis's framing nailer. Travis when I return it I will bring a box of nails to replace what I have used.
I hope to route the doorway and AC opening tonight.
Next...the electrical. I have to call me electrician friend and see when he can get together. He thinks we can do it quickly. ( I Hope he's right  ).
After that its time to panel the other walls, and insulate the partition.
I plan on setting up the shop even before the garage side of the wall is mudded.
Once again thanks to everyone.
Doug |
| |
10-23-2006, 02:57 PM
|
#14 | | Director Moderator
Name: Roger City: Durham State: NC County: Durham Join Date: Jul 2005 Age: 62 Avg Visit Freq/Week = 6.49 over 180 days | Great progress and a great gesture by fellow NCWWers
Roger
__________________
I ain't never had too much fun!
|
| |
10-24-2006, 10:24 AM
|
#15 | | Secretary Moderator
Name: Doug Robinson City: Raleigh State: NC County: Wake Join Date: Jul 2006 Age: 47 Avg Visit Freq/Week = 6.92 over 180 days | Well, my fiend Mike the electrician and I are haveing a tough time find a time when we are both available. It lloks like the first weekend in DECEMBER may be the soonest we can get together.
I cant stand the idle time, so I had a thought, why don't I cut all the paneling for the two other walls (fitting them around the windows, electrical boxes, etc. That way once we open up the walls and install the wiring all I have to do is cut out the outlet openings in the panels, nail them in and ta da! Instant shop. What do you think?
I also thought I would insulate the garage door now as that will not interfere with the electrical work.
Doug |
| |  | | | Thread Tools | | | | Display Modes | Linear Mode |
Posting Rules
| You may not post new threads You may not post replies You may not post attachments You may not edit your posts HTML code is Off | | | | » Stats |
Members: 2,312
Threads: 17,268
Posts: 187,597
2nd Top Poster: jeff... (6,587) | | Welcome to our newest member, chelliot | » Today's Birthdays | bwat | |