North Carolina Woodworker
An Educational Service Of North Carolina Woodworker, Inc.
Oh, Oh, Changes in Progress

Go Back   North Carolina Woodworker > Tools, Equipment, and Techniques > Workshops

Notices

Workshops Tell us about your workshop, or get help with workshop planning and setup


» Announcements
The Woodworking Source Grand Opening
Saturday November 22
Featured Photos
by b4man
· · ·
Member Galleries
24425 photos
10034 comments
by 4yanks
· · ·
Member Galleries
24425 photos
10034 comments
by Gotcha6
· · ·
Member Galleries
24425 photos
10034 comments
by thrytis
· · ·
Member Galleries
24425 photos
10034 comments

» Online Users: 28
1 members and 27 guests
DavidF
Most users ever online was 180, 04-22-2008 at 12:18 AM.
Closed Thread
 
LinkBack Thread Tools Display Modes
Old 02-25-2008, 08:42 PM   #1
This Space for rent
 
meika123's Avatar
 
Name: Dave Snider
City: Advance
State: NC
County: Davie
Join Date: Oct 2007
Age: 64
Posts: 162
Threads: 48
Avg Visit Freq/Week
= 0.17 over 125 days
Another DC question

I have been adding blast gates in my main trunk when using my 4" ducting. I have since seen many systems that only have the gates in the drops. Is that the proper way to do it, or was my old way the way to go. I am confused.
Would someone who is more knowlegeable than me please
respond, so I will get it right?
BTW: I have decided to purchase the 5.0 hp Leeson motor from Ed Morgano as the power supply for my cyclone. Also, I'm reducing the size of my impeller to 16" OUCH!!
Whaddayathink?
__________________
Dave in NC
"A man's gotta know his limitations"!
Show Printable Version Email this Page   Quote this post in a PM to meika123    
Old 02-25-2008, 09:23 PM   #2
This Space for rent
 
Name: Jimmy Coull
City: Clayton
State: NC
County: Johnston
Join Date: Sep 2006
Age: 49
Posts: 2,291
Threads: 142
Avg Visit Freq/Week
= 6.61 over 125 days
Re: Another DC question

Dave,

One thing that I'm thinking is that a 16" impeller and 5hp motor are going to need 6" lines if the system is fairly tight. If you insist on using the 4" lines, you may want a gate open to the air to help with the flow. Two 4" pipes have the same sq/inches as one 6".

Just my .02 worth

Jimmy
__________________
Jimmy

"There are no strangers here, only friends that haven't met"

I only buy what I need now, not what I want..... except for lumber !

Remember: Support your local Sawyers and Kiln Operators.
Show Printable Version Email this Page   Quote this post in a PM to JimmyC    
Old 02-25-2008, 09:29 PM   #3
This Space for rent
 
meika123's Avatar
 
Name: Dave Snider
City: Advance
State: NC
County: Davie
Join Date: Oct 2007
Age: 64
Posts: 162
Threads: 48
Avg Visit Freq/Week
= 0.17 over 125 days
Re: Another DC question

Sorry Jimmy, but I believe you misunderstood. I wasn't perfectly clear either.
I am building a cyclone and switching to all 6" lines. I was just inquiring as to the best placement of the blast gates.
__________________
Dave in NC
"A man's gotta know his limitations"!
Show Printable Version Email this Page   Quote this post in a PM to meika123    
Old 02-25-2008, 09:49 PM   #4
This Space for rent
 
Jim Murphy's Avatar
 
Name: Fern HollowMan
City: Franklinton
State: NC
County: Granville
Join Date: Nov 2006
Age: 58
Posts: 501
Threads: 77
Avg Visit Freq/Week
= 4.98 over 125 days
Re: Another DC question

Put the blast gates at each machine... that is, at each drop. I have my gates between the flex hose and the mains. I've also seen them between the flex hose and the machine. It doesn't matter, it's all about convenience and access.

You are running 6" everywhere except when you get to a machine with a 4" port, right? And when you can, you're expanding the ports to 6" if you can it without a cutting torch and welder, right?

The 5hp Leeson and the 16" impeller will suck the chrome off a hitchball and a bowling ball through a garden hose at the same time with enough suction to spare to eradicate all the chips the jointer or planer can throw. You'll be pleased.
__________________
...I have finally reached the age where my wants and needs have regressed to my early childhood:
---I want everything and need nothing.
Show Printable Version Email this Page   Quote this post in a PM to Jim Murphy    
Old 02-25-2008, 09:54 PM   #5
This Space for rent
 
Name: Jimmy Coull
City: Clayton
State: NC
County: Johnston
Join Date: Sep 2006
Age: 49
Posts: 2,291
Threads: 142
Avg Visit Freq/Week
= 6.61 over 125 days
Re: Another DC question

Dave,

If the system is tight I don't think it will matter (you will have more than enough suction) . Most people have them close to the machine to make it easy, (open gate, remote start collector, start machine). The only problem that I can see on using main trunk gates is inconvenience or having too many machines opened at the same time.

Jimmy
__________________
Jimmy

"There are no strangers here, only friends that haven't met"

I only buy what I need now, not what I want..... except for lumber !

Remember: Support your local Sawyers and Kiln Operators.
Show Printable Version Email this Page   Quote this post in a PM to JimmyC    
Old 02-25-2008, 10:00 PM   #6
This Space for rent
 
Name: Alan Schaffter
City: Washington
State: NC
County: Beaufort
Join Date: Dec 2005
Posts: 1,445
Threads: 198
Avg Visit Freq/Week
= 6.66 over 125 days
Re: Another DC question

No need to put blast gates anywhere but at the machines, maybe one on a drop that you might use for a vacuum hose or floor sweep. You don't need to block off branch lines.

If you are running new 6", then follow these guidelines:
  • NO T's
  • Make straight runs
  • minimal bends
  • where bends are necessary, try to limit them to 45
  • Avoid 90s. Use wyes + 45's instead of 90s.
  • If running PVC, do not use glue, use a small screw to keep it from slipping if you think you need it, and also if you want, a small bead of silicone on the outside of the fitting (it rubs off easily with just a finger) when (not if ) you change a piping run.
Show Printable Version Email this Page   Quote this post in a PM to Alan in Little Washington    
Old 02-25-2008, 10:32 PM   #7
Libraries Administrator
 
McRabbet's Avatar
 
Name: Rob
City: Hendersonville
State: NC
County: Henderson
Join Date: Nov 2005
Age: 66
Posts: 4,492
Threads: 118
Avg Visit Freq/Week
= 6.78 over 125 days
Re: Another DC question

With an appropriate blower housing and impeller (do have an impeller source?), your motor/impeller combination should produce about 1900 CFM (comparable to the ClearVue MAX), so even an 8" main duct with 6" branch lines might be the best option to maintain better airflow. ClearVue has an 8" main od SDR-35 (the green PVC) running down the center of their shop and used 6" drops on wyes.

I agree with Alan and Jim (both cyclone owners) that blast gates should be placed close to the machines, plus I'll add that you should plan to replace the 4" dust ports on your machines with your own 6" versions (I'm planning on making mine from 1/2 of a 6" S&D Coupling glued into plywood or MDF using Gorilla Glue). If you leave the 4" ports in place and reduce your duct to that diameter, air velocity will drop right where you need it maintained at high to pull all of the wood dust and chips through that port. Keep it at 6" to maintain hight CFM.

Good luck!
__________________
Rob

Truths: There is no such thing as a 25 hour day, so why do I keep trying to cram so much into every day so it seems that way!
Show Printable Version Email this Page   Quote this post in a PM to McRabbet    
Closed Thread
  North Carolina Woodworker > Tools, Equipment, and Techniques > Workshops

Tags
question

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

» Log in
You last visited: at
Log Out
User Name:

Password:

Not a member yet?
Register Now!

Search Rockler.com's Extensive Woodworking Catalog

Search from over
9000 products!
Search Woodcraft.com for All Your Woodworking Needs


Search Woodcraft.com For ALL Your Woodworking Needs!
Highland Woodworking Link
» Stats
Members: 2,065
Threads: 16,069
Posts: 174,378
2nd Top Poster: jeff... (6,242)
Welcome to our newest member, dannyj
» Today's Birthdays
MikeF (40)

All times are GMT -4. The time now is 04:14 AM.


Powered by vBulletin® Version 3.7.0
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.2.0
Content Copyright © 2005 - 2008 North Carolina Woodworker, Inc.