North Carolina Woodworker
An Educational Service Of North Carolina Woodworker, Inc.
Discounts on 2010 NCWW Calendar through Nov 30th!!
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
Go Back   North Carolina Woodworker > Woodworking > General Woodworking
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com


» Upcoming Events
Fall 2009 Raffle drawing this Friday (11/20): See This Thread For Details
Closed Thread
 
LinkBack Thread Tools Display Modes
Old 08-30-2008, 11:10 PM  
Outdoor Bulletin Board Project Completed
 
McRabbet's Avatar
Name: Rob
City: Hendersonville
State: NC
County: Henderson
Join Date: Nov 2005
Age: 67
Posts: 6,237
Threads: 155

Show Printable Version Email this Page   Quote this post in a PM to McRabbet  
McRabbet McRabbet is offline 08-30-2008, 11:10 PM
Executive Vice-President
Libraries Administrator

About three weeks ago, I reported on progress I was making on a commissioned project for a branch of the UNC-Asheville called the Center for Craft, Creativity and Design. In this thread, I'll continue the shop work discussion and show how everything has come together for the two units I've built.

As a refresher, here is the design -- Two units with large bulletin board areas on each side behind locked glazed doors. The last thread addressed the glazed doors and I'll continue with putting them into their frames.

1. 2. 3.
4.
5. 6. 7.


1. Assembling the frame with a 44-1/2'' x 39-1/2'' sheet of tempered hardboard set into a groove to support the cork board;

2. For best fit, I decided to mortise the piano hinge into the frame -- here, I'm guiding a 1/8'' deep x 1/2'' wide router cut with an edge guide (uses a 1/4'' bit) -- but the edge guide prevents finishing the mortise to the pencil point, so...

3. I re-positioned the edge guide to make a climb cut so the guide follows the outside of the frame -- real care had to be taken to avoid freehand cut into the frame and grabbing with the climb cut.

4. Success! I mounted the hinges on the doors first and then,

5. Checked the completion of the mortise and position of the hinge.

6. Next I flipped the door open and screwed the hinges into place... Let's see, eight doors with 17 screws on each side of the piano hinges = 272 1/16'' pilot holes and 272 screws...

7. And here is a resulting frame with doors on each side.

Next, on to the field installation -- I didn't take pictures of the joinery details (one shown later), but accuracy in the big timbers was critical for those doors and frames to fit. Here's our sequence:

8. 9. 10.
11. 12. 13.
14.

8. After digging the 12'' holes with a 2-man auger, the 6x6x12' posts were placed in the holes and the half-lapped 4x4 horizontal beams clamped in place. Support diagonals kept the posts perfectly plumb and opposing braces kept the critical rectangular opening perfectly square before the concrete was poured.

9. Two days later, the 4x4 roof framework was added, supported by half-lapped 4x4 diagonals.

10. A ten-foot long ridge board was dropped into a slot atop the 6x6 posts and 2x4 rafters added. It is strong -- it supported my weight on the rood frame putting in the rafters! Next, 1/2'' PT plywood sheathing and 30# roofing paper was added.

11. And finally, 30-year architectural tab shingles were applied to top it off. The Center offices and display gallery are in the background.

12. The final test -- would the pair of framed doors fit the rough lumber? Dead perfect with less than 1/8'' of gap total!!

13. And the doors even open and close as expected!!

14. The real secret to maintaining the accuracy was carefully cut half-lap joinery in the PT beams. Here the upper main horizontal 4x4 laps a vertical 6x6 and the rood support frame sits in a half-lap joint just above it. The diagonals were half-lapped onto the roof frame and lag screwed 3'' into the main uprights. The roof ridge and rafters can be seen in the background.

The client is very pleased and she promised me more work! Plus, I could afford a new jointer from the proceeds!

Thanks for looking.
__________________
Rob Payne

Truths: There is no such thing as a 25 hour day, so why do I keep trying to cram so much into every day so it seems that way!

Last edited by McRabbet; 08-30-2008 at 11:31 PM.. Reason: Put in correct Picture at #2
Views: 438
Old 08-31-2008, 09:21 PM   #16
 
sawduster's Avatar
 
Name: Robert
City: Youngsville
State: NC
County: Franklin
Join Date: Oct 2007
Posts: 1,406
Threads: 171
Avg Visit Freq/Week
= 5.48 over 180 days
Re: Outdoor Bulletin Board Project Completed

WOW !!!!
I will never look at another campground info sign the same ever again

Extraordinary work bro
__________________
...~Robert~
It ain't scrap till I say it's scrap !
Show Printable Version Email this Page   Quote this post in a PM to sawduster    
Old 08-31-2008, 10:33 PM   #17
 
Gofor's Avatar
 
Name: Mark
City: Goldsboro
State: NC
County: Wayne
Join Date: Mar 2006
Posts: 1,574
Threads: 56
Avg Visit Freq/Week
= 4.59 over 180 days
Re: Outdoor Bulletin Board Project Completed

That's pretty awesome. Not just making the doors, but to make a free standing structure out of PT lumber with such accuracy is really amazing.

Go
__________________
"The three hardest things to make in your shop are time, space, and money" - Buz Buskirk (quoted in Woodworking Magazine, Spring 2009)
Show Printable Version Email this Page   Quote this post in a PM to Gofor    
Closed Thread
  North Carolina Woodworker > Woodworking > General Woodworking

Tags
board , bulletin , completed , outdoor , project

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Sewing Cabinet Project Completed KC7CN General Woodworking 21 04-12-2008 01:16 PM
Project completed ScottM Scrollsaw Work 17 03-03-2008 01:52 PM
Workbench project: completed!!! Monty "How To" Forum 174 06-23-2007 08:54 AM
Bedside table project - completed! Monty General Woodworking 103 01-03-2007 12:17 PM
Another project completed today Splinter General Woodworking 15 03-10-2006 10:25 PM

Order your 2010 Calendar!


Search Woodcraft.com for All Your Woodworking Needs


Search Woodcraft.com For ALL Your Woodworking Needs!

Carolina Lumber Sourcing
» Stats
Members: 3,663
Threads: 25,104
Posts: 263,727
Top Poster: DaveO (14,701)
Welcome to our newest member, Keith Senderak
» Today's Birthdays
Dick Barnes (74)
Powered by vBadvanced CMPS v3.2.0

All times are GMT -4. The time now is 04:45 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.3.0
Template-Modifications by TMS
Content Copyright © 2005 - 2009 North Carolina Woodworker, Inc.