North Carolina Woodworker
An Educational Service Of North Carolina Woodworker, Inc.
Discounts on 2010 NCWW Calendar through Nov 30th!!
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
Go Back   North Carolina Woodworker > Woodworking > General Woodworking
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com


» Upcoming Events
Fall 2009 Raffle drawing this Friday (11/20): See This Thread For Details
Closed Thread
 
LinkBack Thread Tools Display Modes
Old 11-26-2005, 12:31 AM   #1
How I spent the past 2 days
 
Steve D's Avatar
Name: Steve DeWeese
City: Horse Shoe
State: NC
County: Henderson
Join Date: Oct 2005
Age: 45
Posts: 1,311
Threads: 69

Show Printable Version Email this Page   Quote this post in a PM to Steve D  
Steve D Steve D is offline 11-26-2005, 12:31 AM
Member

Well the new cyclone for the DC is being delivered Monday so I thought I'd take advantage of the past couple of days and get ready. The shop layout was scattered because we pretty well gutted the house when we bought it so I couldn't really set it up the way I wanted. Now was the chance so I built a lumber storage rack, revised the layout and I'm about 90% through running all new duct. I was able to play with the layout on Grizzly.com until I had the best use of space then dumped the image into my cad program to layout the duct runs. Once I get it wrapped up tomorrow, I'll post pictures. Below is the new layout.

Last edited by Steve D; 11-26-2005 at 12:33 AM..
Views: 372
Old 11-26-2005, 12:37 AM   #2
Moderator
 
sapwood's Avatar
 
Name: Roger
City: Durham
State: NC
County: Durham
Join Date: Jul 2005
Age: 63
Posts: 6,625
Threads: 216
Avg Visit Freq/Week
= 6.42 over 180 days
Re: How I spent the past 2 days

Sweet

You make it all look so simple, but I don't doubt a lot of effort went into your plan. And I can't wait to see the finished shop

Sapwood
__________________
I ain't never had too much fun!
Show Printable Version Email this Page   Quote this post in a PM to sapwood    
Old 11-26-2005, 12:41 AM   #3
 
D L Ames's Avatar
 
Name: D L Ames
City: Fayetteville
State: NC
County: Cumberland
Join Date: Oct 2005
Age: 51
Posts: 2,946
Threads: 66
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Nice lay-out Steve. I look forward to seeing the photos once you get everything in place and running. Did you get your cyclone from Grizzly?

D L
__________________
People sleep peaceably in their beds at night only because rough men stand ready to do violence on their behalf. George Orwell (1903 - 1950)
Show Printable Version Email this Page   Quote this post in a PM to D L Ames    
Old 11-26-2005, 09:57 AM   #4
Member
 
Steve D's Avatar
 
Name: Steve DeWeese
City: Horse Shoe
State: NC
County: Henderson
Join Date: Oct 2005
Age: 45
Posts: 1,311
Threads: 69
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Thanks for the comments. The cyclone is an aftermarket from cyclonseparators.com that will allow me to convert my existing 2HP Grizzly to a cyclone. I'm really looking forward to getting this all back together. The only machine that will roll around to be used is the Performax and that can even be left in position most of the time.
Show Printable Version Email this Page   Quote this post in a PM to Steve D    
Old 11-26-2005, 06:53 PM   #5
Executive Vice-President
Libraries Administrator
 
McRabbet's Avatar
 
Name: Rob
City: Hendersonville
State: NC
County: Henderson
Join Date: Nov 2005
Age: 67
Posts: 6,237
Threads: 155
Avg Visit Freq/Week
= 6.88 over 180 days
Re: How I spent the past 2 days

Steve,

I like the way you've flipped the tablesaw and bench around to make an ideal spot for the Jointer -- this will give you a much more efficient layout compared to what I saw during my visit recently. Good job!

Rob
__________________
Rob Payne

Truths: There is no such thing as a 25 hour day, so why do I keep trying to cram so much into every day so it seems that way!
Show Printable Version Email this Page   Quote this post in a PM to McRabbet    
Old 11-27-2005, 09:53 AM   #6
 
Monty's Avatar
 
Name: Monty
City: Hickory
State: NC
County: Catawba
Join Date: Jul 2005
Posts: 3,282
Threads: 232
Avg Visit Freq/Week
= 2.02 over 180 days
Re: How I spent the past 2 days

I like your shop layout - it really seems to lend itself well to efficient work flow and dust collection. I don't understand the "double-back" over the end of the tablesaw/workbench, though. Unless I'm missing something, I think that's a bad idea. I think I would connect it up with a shorter piece of pipe, and tie it in to the main line with another wye connection over the infeed table of the jointer.
__________________
My fledgeling woodworking web site: ShootingBoard.net
Show Printable Version Email this Page   Quote this post in a PM to Monty    
Old 11-27-2005, 10:20 AM   #7
 
D L Ames's Avatar
 
Name: D L Ames
City: Fayetteville
State: NC
County: Cumberland
Join Date: Oct 2005
Age: 51
Posts: 2,946
Threads: 66
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Originally Posted by insomniac
I don't understand the "double-back" over the end of the tablesaw/workbench, though. Unless I'm missing something, I think that's a bad idea.
I assumed he ran the pipe from his DC to the wall, dropped it to the floor and then ran it to his tablesaw and Jointer. I think if he used the shorter method, although more efficient, it would leave a pipe or hose hanging down in the middle of his shop creating an obstruction. Of course I may be missing something too.

D L
__________________
People sleep peaceably in their beds at night only because rough men stand ready to do violence on their behalf. George Orwell (1903 - 1950)
Show Printable Version Email this Page   Quote this post in a PM to D L Ames    
Old 11-27-2005, 12:16 PM   #8
Member
 
Steve D's Avatar
 
Name: Steve DeWeese
City: Horse Shoe
State: NC
County: Henderson
Join Date: Oct 2005
Age: 45
Posts: 1,311
Threads: 69
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Right on the money DL, it drops down the wall and runs across at floor level to the tablesaw and Jointer. I didn't want to step over anything in the walkways. I'm also dropping power from above for the same reason.
Show Printable Version Email this Page   Quote this post in a PM to Steve D    
Old 11-27-2005, 01:08 PM   #9
 
D L Ames's Avatar
 
Name: D L Ames
City: Fayetteville
State: NC
County: Cumberland
Join Date: Oct 2005
Age: 51
Posts: 2,946
Threads: 66
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Originally Posted by Steve D
I'm also dropping power from above for the same reason.
Steve, I did the same thing with my power. I have a 220 box in the ceiling near the end of my tablesaw and have about a 10' cord hard wired with a compression fitting. It works great with no cords on the floor. I also put two 110 outlets in the ceiling at either end of the shop and have retractable extension cords plugged into both of those. Those things come in real handy.

D L
__________________
People sleep peaceably in their beds at night only because rough men stand ready to do violence on their behalf. George Orwell (1903 - 1950)
Show Printable Version Email this Page   Quote this post in a PM to D L Ames    
Old 11-27-2005, 06:17 PM   #10
 
Monty's Avatar
 
Name: Monty
City: Hickory
State: NC
County: Catawba
Join Date: Jul 2005
Posts: 3,282
Threads: 232
Avg Visit Freq/Week
= 2.02 over 180 days
Re: How I spent the past 2 days

I don't know..... sounds like an excellent excuse to get one of them overhead blade guards, with the DC dropping straight down from the ceiling right over the tablesaw.... Shorter DC pipe run (= better cfm), better dust collection, safety, higher style points.... more tools.... I don't see the drawback!!!



(by the way, did I mention -- I'm immune to the WG disease, but I'm definitely a carrier!!! )
__________________
My fledgeling woodworking web site: ShootingBoard.net
Show Printable Version Email this Page   Quote this post in a PM to Monty    
Old 11-27-2005, 08:06 PM   #11
Member
 
Steve D's Avatar
 
Name: Steve DeWeese
City: Horse Shoe
State: NC
County: Henderson
Join Date: Oct 2005
Age: 45
Posts: 1,311
Threads: 69
Avg Visit Freq/Week
= 0.00 over 180 days
Re: How I spent the past 2 days

Reading my mind insomniac, that's what the thin line is coming off of the duct run over the tablesaw. All the duct is 6" and the thin lines indicate 4" drops. I'm planning to build an overhead collection point / blade guard and I can hang it right from the ceiling.

One other thing I found that worked great for hanging the duct is the joist hangers used for hanging drop ceilings. There is a driver attachment that goes into your cordless drill and you can just run the lag hangers right into the joist. I then wrapped the duct with the same wire used for drop ceilings and tied it off to the hangers.

Last edited by Steve D; 11-27-2005 at 08:12 PM..
Show Printable Version Email this Page   Quote this post in a PM to Steve D    
Closed Thread
  North Carolina Woodworker > Woodworking > General Woodworking

Tags
days , past , spent

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Just 8 days left..... to the Get together of all Get Togethers!!! woodguy1975 User Announcements 0 10-21-2005 10:32 PM

Order your 2010 Calendar!


Search Woodcraft.com for All Your Woodworking Needs


Search Woodcraft.com For ALL Your Woodworking Needs!

Carolina Lumber Sourcing
» Stats
Members: 3,663
Threads: 25,105
Posts: 263,755
Top Poster: DaveO (14,701)
Welcome to our newest member, Keith Senderak
» Today's Birthdays
Dick Barnes (74)
Powered by vBadvanced CMPS v3.2.0

All times are GMT -4. The time now is 09:48 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.3.0
Template-Modifications by TMS
Content Copyright © 2005 - 2009 North Carolina Woodworker, Inc.